Skip Navigation

Town of Cortlandt, NY

http://townofcortlandt.com/cn/news/archnews.cfm?NID=56284&jump2=0

Email a link to this web page.
Simply fill out this form and click Send.
*Fields in Red are required.
*You must enter a valid email
*You must enter a valid email.
Town of Cortlandt SealGo to our home page
CORTLANDT MANOR WEATHER

Latest News

Please select a year.

Rt. 6/Rt. 202 Culvert Replacement Update From NY State DOT

Release Date: October 20, 2023

U.S. Route 6/State Route 202 (the Goat Trail) remains one lane in each direction with an alternating traffic signal at Roa Hook Road to facilitate the replacement of a culvert. This project requires the replacement of the existing culvert with a bridge structure.

The New York State Department of Transportation contractor has mobilized on site to begin the work to install a temporary one lane bridge in the eastbound lane to allow the contractor to work in stages. A location has been designated for equipment on site, and the removal of guide rail and asphalt has begun. Night time closures are expected for the installation of the bridge and message boards will advise motorists in advance of the closures. This project has an anticipated substantial completion Summer 2024, weather permitting.

Motorists are urged to slow down and drive responsibly in work zones. Fines are doubled for speeding in a work zone. Convictions of two or more speeding violations in a work zone could result in the suspension of an individual’s driver license.

For up-to-date travel information, call 511, visit www.511NY.org or download the free 511NY mobile app. Follow New York State DOT on Twitter: @NYSDOT and @NYSDOTHV. Find NYSDOT on Facebook at facebook.com/NYSDOT